Worldwide Supplier of Parts and Accessories for Land Rover Vehicles Allmakes 4x4 - Quality, Value and Performance

Our PR2 Selection Criteria

In order to determine the products that will go into the Allmakes 4×4 Premium Range, the following criteria has been used:

  1. Does the product fit Land Rover vehicles built after 1997?
    1. If Yes, pass it through to the next stage
    2. If No, not eligible.
  2. Does Allmakes 4×4 have history of selling the product?
    1. If Yes, pass it through to the next stage
    2. If No.
      1. Is the product from a current manufacturer of original equipment to Land Rover?
        1. If Yes, product will be introduced and subject to continuous monitoring and review to ensure PR2 standards and retained.
        2. If No, then the product will be subject to full PR2 quality inspection. If it passes it will be included in the PR2 range if not it will be excluded until PR2 standards are met.
  3. Has the product been returned on warranty on an annualised 12 month period?
    1. If Yes, is the successful warranty return rate 0.5% of sales or less?
      1. If Yes, pass it through to the next stage
      2. If No, not eligible.
    2. If No, pass it through to the next stage.
  4. Have we received quality complaints relating to the product?
    1. If Yes, is the legitimate complaint rate 0.05% of sales or less?
      1. If Yes, pass it through to the next stage
      2. If no, not eligible
    2. If no, pass it through to the next stage.
  5. Does the product come from a manufacturer with a proven history of offering exceptional quality into the Land Rover aftermarket?
    1. If Yes, pass it through to the next stage
    2. If No, not eligible
  6. Is the manufacturer a reliable and prompt supply source?
    1. If Yes, pass it through to the next stage
    2. If No, not eligible
  7. Does the product have a history of being fitted by qualified technicians in recognized UK workshops?
    1. If Yes, pass it through to the next stage.
    2. If no, not eligible
  8. Is the product perishable?
    1. If Yes, has the product been on our shelves for more than its shelf life?
      1. If Yes, not eligible
      2. If no, pass it through to the next stage.
    2. If No, pass it through to the next stage.
  9. Is the product suitably packaged for distribution?
    1. If Yes, pass it through to the next stage.
    2. If no, not eligible.
  10. Has the quality assessment team confirmed the quality?
    1. If Yes, pass it though to the next stage.
    2. If no, not eligible.
  11. Has the Purchasing Director confirmed the quality?
    1. If Yes, the product qualifies for PR2.
    2. If no, not eligible.
TRADE PORTAL LOGIN | PRIVACY POLICY | TERMS AND CONDITIONS | SITE MAP | NEWSLETTER SIGNUP Allmakes 4x4 - Quality, Value and Performance
 
© Allmakes 2004-2012        Follow us on Twitter Visit Allmakes4x4 Facebook page Join Allmakes4x4 LinkedIn group Valid XHTML 1.0 Transitional Valid CSS!Secured by RapidSSL